FY24 production of 34.6 mboe/d had been reported previously. The GE-05 well (Serica WI: 100%) has been brought into production at a stable rate of 6 mbbl/d after having flowed 9 mbbl/d on test.
What is covered in the Full Insight:
Introduction to Serica Energy's 2025 Production Goals